Full Project-IMPACT OF COST CONTROL IN MANUFACTURING INDUSTRIES AS WELL AS ITS PROBLEM

Full Project-IMPACT OF COST CONTROL IN MANUFACTURING INDUSTRIES AS WELL AS ITS PROBLEM

Click here to Get this Complete Project Chapter 1-5

IMPACT OF COST CONTROL IN MANUFACTURING INDUSTRIES AS WELL AS ITS PROBLEM

 

ABSTRACT

These research works try as much as possible to look into the impact of cost control in manufacturing industries as well as its problem. In pursuance of this objective, there will be head to highlight the following. Make detailed explanation of the methodology involved in the heading of the cost control in that case study. Chapter one of this project based on the scopes, purpose, hypothesis in a manufacturing concern, it also deals with the background statement of the problem and definition of term in the cost control system. Chapter two deals with the literature review where definition and meaning of cost control, control methods need for cost control, importance, modern development, types, merits, costing system and cost control as it affects Nigeria Bottling Company Plc was being mention here. Chapter three deals with the research methodology like area of study, population, sample and sampling procedure, method of data collection and others.

Chapter four based on data analysis and interpretation of the study. Also deals with findings that are concern mainly with that method adopted. It recommended that if more accurate cost control record kept, the organisation would achieve more than their present value of their production.

CHAPTER ONE

1.0     General Introduction

1.1     Background of the study

Management as a discipline is becoming more dynamic in nature as a result of complexities that surrounds our business world. Numerous routine planning and control activities formally performed by clerks have now been developed into sophisticated functions with far reading effect on corporate objectives and profits. Cost control, a vital element of cost management is one of such functions.

Cost can be defined as the monetary measures of value consumed acquired. It is the amount of expenditure (actual or national) incurred on or attributable to a specific thing or activity.

Cost can also be defined as the amount of goods or the provision of a service (Eddy, 1991). In other words, it means the amount of expenditure incurred on a particular project or venture over a given period of time. It could be fixed cost, variable cost and opportunity cost etc.

In addition, cost analysis is the process of discovering the purpose in which factors of production have been used for concise information in management decision. However, cost control is defined as a profit maximize, monitoring and a central criterion of costs. This means that a task of controlling must be related to decision of importance for the success of operation as a whole, within the scope of the planning and controlling process. Further, another relevant area of cost is budgeting control which is defined as a system of managing a business. It also deals with other control like inventory control or stock control, variance analysis (standard and actual control)

1.2     Statement of the Problem

Cost control problem are not peculiar to manufacturing organisation only but also extended to armed forces, government and other PAYEE agencies.

The following are the cost control problems in manufacturing concern:

(a) The divisible and manner of cost control in the company.

(b) The company is facing the problem of setting budget and standard cost.

(c) The problem of comparing the total accurate standard or variance.

1.3     The Research Hypothesis

Hypothesis can be defined as a tentative probable explanation of the relationship between two or more variables that create a state of affair or phenomenon.

These hypothesis are formulated under two sub-headings null and alternative hypothesis. Null hypothesis is normally represented by “H0” while alternative hypothesis is represented by “H1” limit the context of our studies Null hypothesis is preferred.

The research work to be considered is:

How cost control and factory management affect the pricing of finished goods?

1.4     Objectives of the Study

The main purpose of this study is to make official review and analytical demonstration of cost control in a manufacturing organisation. Costing system differs from one industry to another.

In pursuance, there is a need to highlight the following Aids:

(a)     Identify the cost control system and method used in Nigeria bottling company.

(b)     Determine the importance of cost control in a manufacturing concern.

(c)     Make detailed explanation of the Nigeria bottling company Plc.

(d)     Assess the effectiveness of cost control in our case study (cost and budget)

(e)     Determine the units of production cost

1.5     The Scope of the Study

One of the primary responsibilities of management is to set up and implement the cost control in industries. The project work will examine critically the cost control system and factory management used in the industries classification of cost reduction and standard costing. However, the work will not be studied in department because of some financial constraint and problem of planning.

1.6     The Significance of the Study

The study will be beneficial to small scale industries in the area of adequate budgeting. There will be a mutually agreed budgets or standard where appropriate. This will aid adequate decision-making for these small scale industries.

The study will be beneficial to both the Federal and state government in the area of controlling the cost of goods and services in the manufacturing industries. There would be recommendations at the end of the study in order to help the government on how to control the cost of goods and services.

The study will also be beneficial to the students on the area of their academics. The study will help other students on how to control the cost of goods and services if eventually they find themselves in industries.

1.7     Historical Background

Nigeria bottling company plc was incorporated as a private company with authorized share capital of N20,000 divided in 40,000 ordinary shares of 50k each and issued share capital of 50k each by foreign shareholders, notable; The company establish for the purpose of manufacturing and marketing table water, Coca-Cola and Sprite in Nigeria. Under a franchise agreement with Coca-Cola international through changing of distribution outlet all over the country

However, in the past six decades, the company has diversified tremendously into vital areas through subsidiaries and associates. About six years ago, Nigeria bottling company Plc acquired other assets of Nigeria soft drinks, company bottlers of Schweppes international limited for the exclusive manufacturing and marketing in Nigeria of the Schweppes range of products.

The purpose was to eliminate competition in the area of bitter lemon product. Around that time, the company took over the assets of Nigeria soft drinks Company. It successfully acquired 40% interest in the two bottling plants in the north; drink and other. All were done to associate the company base and strengthen its competitive position.

The maize production company, AGENBOBY operates the following Agro-Industrial ventures which are integrated with the company farming activities.

(a)     Maize milling and maize grits plant.

(b)     Rice milling and par-boiling

(C)     Oil extract and refining

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

1, Accounting Research Project

  1. Adult Education
  2. Agricultural Science
  3. Banking & Finance
  4. Biblical Theology & CRS
  5. Biblical Theology and CRS
  6. Biology Education
  7. Business Administration
  8. Computer Engineering Project
  9. Computer Science 2
  10. Criminology Research Project
  11. Early Childhood Education
  12. Economic Education
  13. Education Research Project
  14. Educational Administration and Planning Research Project
  15. English
  16. English Education
  17. Entrepreneurship
  18. Environmental Sciences Research Project
  19. Guidance and Counselling Research Project
  20. History Education
  21. Human Kinetics and Health Education
  22. Management
  23. Maritime and Transportation
  24. Marketing
  25. Marketing Research Project 2
  26. Mass Communication
  27. Mathematics Education
  28. Medical Biochemistry Project
  29. Organizational Behaviour
  30. Other Projects
  31. Political Science
  32. Psychology
  33. Public Administration
  34. Public Health Research Project
  35. More Research Project
  36. Transportation Management
  37. Nursing

 

 

Need a Project Writer for a Different Topic

Click here to Get The Complete Research Project Chapter 1-5

RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | Https://eduschooler.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
Simply click on the Download button above and follow the procedure stated.
I have a fresh topic that is not on your website. How do I go about it?
Chat with us on WhatsApp or contact our Instant Help Desk for a custom research project on your topic.
How fast can I get this complete project on any project topic?
Within 15 minutes if you want this exact project topic without adjustment.
Is it a complete research project or just materials?
It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data.
What if I want to change the case study for this topic?
Chat with Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
How will I get my complete project?
Your Complete Project Material will be sent to your Email Address in Ms Word document format.
Can I get my Complete Project through WhatsApp?
Yes! We can send your Complete Research Project to your WhatsApp Number.
What if my Project Supervisor made some changes to a topic I picked from your website?
Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
Do you assist students with Assignment and Project Proposal?
Yes! Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
What if I do not have any project topic idea at all?
Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 708 7083 227.
How can I trust this site?
We are genuine and duly registered with the Corporate Affairs Commission. This site runs on Secure Sockets Layer (SSL), ensuring all transactions are highly secure and safe.
Customer Testimonials | Https://eduschooler.com

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. Https://eduschooler.com delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://eduschooler.com is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend eduschooler.com to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!