Full Project – CONSTRUCTION OF A VERTICAL FIRE TUBE BOILER

Full Project – CONSTRUCTION OF A VERTICAL FIRE TUBE BOILER

Click here to Get this Complete Project Chapter 1-5

ABSTRACT

The construction of this vertical fire tube boiler was carried out both at the industrial center and Mechanical Engineering workshop of the Institute of Management and Technology (IMT), Enugu.

The boiler contains 2 steam  tubes at triangular pitch which are enclosed in a shell.  Water is introduced through the shell.  When the burner is put on, the products of combustion – excess oxygen, nitrogen and carbondioxide pass through the tubes at a high temperature and then heats the surrounding water, as a result, steam is generated.

It has a capacity of 20,000cm3 of water and can produce 0.05kg of steam per hour.  It can be used widely for the generation of stem for laboratory uses and by small scale industries.

The materials used were mainly mild steel.  About 10 electrodes were used for the welding and care was taken to ensure strong welding, although it is a low pressure boiler. The top sheet plato is 0.0125cm thick.  The tube bundles are galvanized tubes.  Details of the engineering and working drawings are shown.  The construction of this boiler did not follow any code.

TABLE OF CONTENTS

CHAPTER ONE

Introduction

CHAPTER TWO

Literature Survey

CHAPTER THREE

Material Selection

CHAPTER FOUR

Constructional Methods

CHAPTER FIVE

Discussion

Conclusion

References

Bibliography

CHAPTER ONE

INTRODUCTION

The term “boiler” applies to a device for generating: Steam for power, processing or heating purposes; Hot water for heating purposes or hot water supply. Boilers are designed to transmit heat from an external combustion source (usually full combustion) to a fluid contained within the boiler itself.

Boilers can be broadly grouped into lower pressure type and high pressure boiler.  The constructed vertical fire tube boiler is a low pressure boiler. The boiler is constructed so as to generate steam for chemical engineering processes, heating drying, sterilizing, etc.

Holes at triangular pitch were drilled at the bottom and top sheet plates of the boiler.  Steam tubes were passed through these holes and then welded strongly.  Other holes were drilled only on the top plate, so that steam will pass through them.  This was pushed in to a shell and welded together.  A mild steel plate was used to prevent the products of combustion passing from the steam tubes to come into contact with the generated steam.  A stack was provided for the flue gases to escape.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour

32    Other Projects pdf doc

  1. Political Science
  2. Psychology
  3. Public Administration
  4. Public Health Research Project
  5. More Research Project
  6. Transportation Management
  7. Nursing

Education

 

Full Project – CONSTRUCTION OF A VERTICAL FIRE TUBE BOILER