Full Project – Computerized production control management information system

Full Project – Computerized production control management information system

Click here to Get this Complete Project Chapter 1-5

CHAPTER ONE

GENERAL INTRODUCTION

1.0     INTRODUCTION

Production control system provides strict quality control with a lot of tracking functions. As fully integrated with other systems such as financial management system and cost management system, data processing is efficiency done and data integrity is maintained. Management can derive information necessary for decision making from different modules integrated to the production management system. It gives them ways to evaluate performance of each department in the company especially in production. In addition, information is disseminated accordingly. If the production results adequately meet the requirement of production schedule plan, it shows that an affective production management system is utilized.

According to S. Anil Kumar (2008), production control is the process of planning the production in advance, setting the exact route for each item, fixing the starting and finishing dates for each item, to give production orders to shops and to follow up the progress of products according to orders. The principle of production planning and control lies in the statement “first plan your work and then work on your plan”.

1.1     STATEMENT OF PROBLEMS

         This research intends to provide answers to the following questions through the system analysis and design of a computerized production control management information system in Coca-Cola Company, Kano. Problems identified with the present management information system of the organization are as follows:

  1. As a result of the huge customer base, it may be impossible to maintain the purity of the product in terms of consistency to the customers.
  2. Inadequate quantity of resources due to high demand.
  3. Unskilled factory or machine operators.
  4. Misplacement of requirement for production.
  5. Poor calculation of quantity of resources to be used for production.
  6. Distribution network: the company has got an average distribution network this is one of the reason why companies fail to fulfil the demand of the customer time. It must go for some more bottling channels to increase the sales in the best possible manner.

 

1.2     AIMS AND OBJECTIVES

         The aims and objective of this project therefore is to design basic program that can be used towards providing answers to all the questions in the previous section. The researchers also intend to introduce a computerized production control management information system as a better replacement for the existing manual ones in-use by the company.

 

1.3     SIGNIFICANCE OF THE STUDY

         This study will benefit the organization in so many ways as briefly highlighted in the following:

  1. Reduction in labour requirement: The number of staff required will be reduced and that will reduce labour costs.
  2. Enhanced production efficiency as the new system will be faster and effective.
  3. Accuracy of information.
  4. Simplified process of information and management.

 

1.4     SCOPE AND LIMITATION

This research work focus on the design of a computerized production control management information system. It will further held the management with information that will determine the production rate of the organization daily it will further give proper account about materials used by the company and help to control the material used during production.

This study was limited to only few production sites at Kano South. But despite these limitations, the researcher has been able to use his best capacity to gather good effective appropriate and actual facts.

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for international clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour

32    Other Projects pdf doc

  1. Political Science
  2. Psychology
  3. Public Administration
  4. Public Health Research Project
  5. More Research Project
  6. Transportation Management
  7. Nursing

Education

Essay 

 

 

Full Project – Computerized production control management information system

Click here to Get The Complete Research Project Chapter 1-5

RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | Https://eduschooler.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
Simply click on the Download button above and follow the procedure stated.
I have a fresh topic that is not on your website. How do I go about it?
Chat with us on WhatsApp or contact our Instant Help Desk for a custom research project on your topic.
How fast can I get this complete project on any project topic?
Within 15 minutes if you want this exact project topic without adjustment.
Is it a complete research project or just materials?
It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data.
What if I want to change the case study for this topic?
Chat with Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
How will I get my complete project?
Your Complete Project Material will be sent to your Email Address in Ms Word document format.
Can I get my Complete Project through WhatsApp?
Yes! We can send your Complete Research Project to your WhatsApp Number.
What if my Project Supervisor made some changes to a topic I picked from your website?
Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
Do you assist students with Assignment and Project Proposal?
Yes! Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
What if I do not have any project topic idea at all?
Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 708 7083 227.
How can I trust this site?
We are genuine and duly registered with the Corporate Affairs Commission. This site runs on Secure Sockets Layer (SSL), ensuring all transactions are highly secure and safe.
Customer Testimonials | Https://eduschooler.com

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. Https://eduschooler.com delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://eduschooler.com is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend eduschooler.com to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!

Live Chat
Admin is typing...