Full Project – ESTIMATING SOME MECHANICAL PROPERTIES OF ROCK FROM IN-SITU REBOUND VALUES (A CASE STUDY OF OREKE OPEN PIT QUARRY)

Full Project – ESTIMATING SOME MECHANICAL PROPERTIES OF ROCK FROM IN-SITU REBOUND VALUES (A CASE STUDY OF OREKE OPEN PIT QUARRY)

Click here to Get this Complete Project Chapter 1-5

CHAPTER ONE

1.0       INTRODUCTION

Rock mechanics engineers design structures built in rock for various purposes, and therefore need to determine the properties and behavior of the rock. The UCS of rocks is one of the important input parameters used in rock engineering projects such as design of underground spaces, rock blasting, drilling, slope stability analysis, excavations and many other civil and mining operations. ISRM (1981) testing of this mechanical property in the laboratory is a simple procedure in theory but in practice, it is among the most expensive and time-consuming tests. This calls for transportation of the rock to the laboratory, sample preparation and testing based on the international standards. In order to carry out these standard tests, special samples, such as cylindrical core or cubical samples, need to be prepared. Preparing core samples is difficult, expensive and time-consuming. Moreover, the preparation of regular-shaped samples from weak or fractured rock masses is also difficult.  Under these circumstances, the application of other simple and low-cost methods to carry out the above tasks with acceptable reliability and accuracy will be important. Therefore, indirect tests are often used to estimate the UCS, such as Schmidt hammer, point load index and sound velocity. Indirect tests are simpler, require less preparation and can be adapted more easily to field testing (Feneret al. 2005).

The Schmidt hammer rebound hardness test is a simple and non-destructive test originally developed in 1948 for a quick measurement of USC and later was extended to estimate the hardness and strength of rock. The mechanism of operation is simple: a hammer released by a spring, indirectly impacts against the rock surface through a plunger and the rebound distance of the hammer is then red directly from the numerical scale or electronic display ranging from 10 to 100. In other words, the rebound distance of the hammer mass that strikes the rock through the plunger and under the force of a spring, indicates the rebound hardness. Obviously, the harder the surface, the higher the rebound distances. (Torabiet al. 2010; Schmidt, 1951).

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

 

 

Need a Project Writer for a Different Topic

Full Project – ESTIMATING SOME MECHANICAL PROPERTIES OF ROCK FROM IN-SITU REBOUND VALUES (A CASE STUDY OF OREKE OPEN PIT QUARRY)