ABSTRACT

This project, focus on preliminary activities that lead to draft bill of qualities for a propose multi-purpose studio hall, Ilorin. It’s centralized on preparation of bill of qualities for a studio hall and taking offs project. Meanwhile, this is to prepare the construction legation and to understand the construction arrangement between the client and the client and the construction company, industry.

 

 

 

 

 

 

 

 

TABLE OF CONTENTS

Title page                                                             i

Certification                                                        ii

Dedication                                                           iii

Acknowledgement                                               iv-v

Gratitude                                                             vi

Table of content                                                  vii-x

CHAPTER ONE

1.0    Background Information                          1-3

1.1    Description of work                                  3-4

1.2    Aims & Objectives                                     4-5

1.3    Scope of the Project                                  9-10

CHAPTER TWO

2.0    Title                                                            14

2.1    Location                                                     14-16

2.2    Site Description                                        16-17

2.3    Accessibility                                              17-19

2.4    Availability and Proximity of Resource    19-20

2.5.   Definition of terms                                              26

CHAPTER THREE

3.0    General rules for taking-off                                37

3.1    Receipt of the drawings                                      37

3.2    Preliminary study of drawing                             37

3.3    Queries with the designers                                38-39

3.4    Organizing the work                                            39

3.5    Section of taking-off

3.6    Composition & Preparation of BOQ

3.7    Stages in BOQ

3.8    Method of bill preparation

3.9    Rules of Billing

CHAPTER FOUR

4.0    Sub Structures                                                   40

4.1    Super Structure                                                 40

4.2    Abstracting                                                         40-46

4.3    BOQ                                                                     46-49

4.4    Quarry sheet and drawing plan                         49-50

CHAPTER FIVE

5.0    Summary                                                             57

5.1    Conclusion                                                                   58-59

5.2    Recommendations

5.3    References

 

 

CHAPTER ONE

1.0   BACKGROUND INFORMATION

This project is based on proposed multi-purpose studio hall off Oke Ose community central mosques Ilorin.

Kwara state is one of the 36 states in Nigeria, in which Ilorin is the Capital; in Kwara state we have several higher institutions which include university of Ilorin, Kwara State Polytechnic, Federal Polytechnic Offa, College of Education Oro, Kwara State University Ilorin and also College of Education Ilorin.

TELEVISION STUDIO

        A television studio is an installation in which video production take place, either for the recording of live television to video tape, or for the acquisition of raw footage for post production.

 

 

STUDIO FLOOR

A studio floor is the actual stage on which the actions that will be recorded take place. Studio floor has the following characteristics and installations:-

  • Decoration or sets
  • Professional video camera (sometimes one usually several) on pedestals.
  • Microphones
  • Stage lightning rigs and the associated controlling equipment.
  • Several video monitors for visual feedback from the production control room (PCR).
  • A small public address system for communication
  • A glass window between PCR and studio floor for direct visual contract is usually desired, but not always possible while a production is in progress, people composing a television crew work studio floor.

PRODUCTION CONTROL ROOM

The studio control room (SCR) is the place in a television studio in which the compositions of the outgoing program take place. The production control room is occasionally also called a studio room.

MASTER CONTROL ROOM

The mater control room, house equipment that is too noisy or runs too hot for the production control room (PCR). It also makes sure that coax cable and other wire lengths and installation requirement keep within manageable lengths since most high-quality wiring runs only between devices in this room.

OTHER FACILITIES

A television studio usually has other rooms with no technical requirement beyond broadcast reference monitors and studio monitors for audio. Among them are:-

  • One or more make-up and changing rooms.
  • A reception area for crew, toilet and visitors, commonly called the green room.

The design term on consultancy, services headed by the Architects, civil engineers, who carry out the design, this process are a planned office works into the requirement of the client. The production of a building in a more economical, quick and orderly manner, other professional function along side with the architect for the cost implication and preparation of bill of quantities (BOQ). The expected professional needed at the stage is the quantity surveyor. His concern is the economics of all resources such as labor, plant materials and financial aspect in order to produce building in the quick and economical manner because many building today have not been completed.

 

 

1.1   DESCRIPTION OF WORKS

        These projects consist of construction and erection of the proposed Multi-Purpose studio Hall situated at Oke-Ose community at University of Ilorin teaching hospital Ilorin Kwara State, Nigeria.

The studio development and take off project will be constructed on loamy soil of about 28,410 in length and 13,820 widths.

The construction is formed on plain over site concrete floor is of reinforce concrete slab (150mm thick). The walls are 230mm tick concrete block. The roofing used in long san aluminum roofing sheet fixed a roofing structure, plumbing installation, electrical installation complete etc.

 

 

 

1.2   AIM AND OBJECTIVES

        The major aim of the study is to estimate and budget for proposed Multi studio hall at Oke Ose community, Ilorin.

OBJECTIVES

  • To understand bill operation of taking off process, abstraction bill drafting and pricing.
  • To understand the process of site feasibility report.
  • To understand the process of given pre-construction cost of any proposed project.

1.3   SCOPE OF THE PROJECT

The scope of the project is to prepare a draft bill of quantities for a proposed multipurpose studio hall.

However, the limitation may not be accurate as a result of:

  • Inability of conduct proper site investigation.
  • Inability of conduct the architect that designs the project

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

1, Accounting Research Project

  1. Adult Education
  2. Agricultural Science
  3. Banking & Finance
  4. Biblical Theology & CRS
  5. Biblical Theology and CRS
  6. Biology Education
  7. Business Administration
  8. Computer Engineering Project
  9. Computer Science 2
  10. Criminology Research Project
  11. Early Childhood Education
  12. Economic Education
  13. Education Research Project
  14. Educational Administration and Planning Research Project
  15. English
  16. English Education
  17. Entrepreneurship
  18. Environmental Sciences Research Project
  19. Guidance and Counselling Research Project
  20. History Education
  21. Human Kinetics and Health Education
  22. Management
  23. Maritime and Transportation
  24. Marketing
  25. Marketing Research Project 2
  26. Mass Communication
  27. Mathematics Education
  28. Medical Biochemistry Project
  29. Organizational Behaviour
  30. Other Projects
  31. Political Science
  32. Psychology
  33. Public Administration
  34. Public Health Research Project
  35. More Research Project
  36. Transportation Management
  37. Nursing

 

 

Need a Project Writer for a Different Topic

Leave a Reply