HE CAUSE OF ABANDONED PUBLIC DEVELOPMENT PROJECTS IN THE FEDERAL CAPITAL TERRITORY ABUJA

CASE STUDY FCDA

ABSTRACT

The continues abandoning of public projects at various levels of development all over the country is of great concern not only to the governments themselves but more to civil servants who are too inadequately accommodated.

In this research work efforts have been made to identify, analyzed and discuss the basic causes of abandonment federal capital development Authority (FCDA) projects.

Chapter one serves as an introduction which outlines the background of the study, statement to the problems, aims / objectives of the study, research questions, significance of the study, scope of and limitations of the study plus overview of the study of the federal capital territory (FCT) Abuja.

Chapter two serves as literature reviews definition of special terms and also into introduces the reader to some housing policies in Nigeria.

The third chapter serves as research methodology where all the sources and method of data collection used in this work are explained.

Chapter four is the core of the research work where data collection from the filed are presented and analyzed.

TABLE OF CONTENTS

CHAPTER ONE

1.0       Introduction

1.1       Background of the Study

1.2       Statement of the Problem

1.3       Aims / Objectives of the Study

1.4       Research Questions

1.5       Significance of the Study

1.6       Scope and limitations of the study

1.7       Overview of the study

CHAPTER TWO

2.0       Literature Review

2.1       Abandonment

2.2       Development

2.3       Development Process in Building Industry

2.4       Project

2.5       Public Sector Involvement in Housing Development

2.6       Types of Public Property

CHAPTER THREE

3.0       Methodology

3.1       Data Primary Sources

3.2       Secondary Data

3.3       Limitations

CHAPTER FOUR

4.0       Data Analysis

4.1              Respondents Views on Causes Abandonment

4.2              Respondents Views on the Effect of Abandonment

4.3       Respondents Views on the Possible Solution Abandonment

4.4       Discussion the Findings

CHAPTER FIVE

5.0       Summary Recommendations and Conclusion

5.1       Summary

5.2       Recommendation

5.3       Conclusion

5.4       References

CHAPTER ONE

1.0        INTRODUCTION

Only little portion of government projects are executed by direct labour, while most of the development projects are awarded to contractions.

Public structures have been known to be abandoned in the cause of construction or left to dilapidate after being practically completed.

Incidents of abandoned projects are rampant all over the country e.g. from Enugu to ILorin, port Harcourt to sokoto and Lagos to Maidugwi. Projects of high capital cost. Such as residential buildings, office buildings and even road constructions.

1.1       HISTORICAL BACKGROUND OF THE FEDERAL CAPITAL TARRITORY VIZ – AVIZ FEDERAL CAPITAL DEVELOPMENT AUTHORITY ABUJA (FCDA)

The federal capital territory Abuja was created in 1976 by Decree No6 of that year which was established the federal capital development agency responsible for the design, construction and administration of the territory.

The decree also vested ownership and control for all land in the territory in the federal government of Nigeria. The territory which is located at the centre of the country covers an areas of 8000sqkm.

It is therefore more than twice the land area of Lagos state (93535sq.km) about two-thirds the size of Imo state (13032sq. km).

The federal capital territory itself is designed to cover an area of 256sq. Km or 3% of the total land area of the territory and at full development the city is expected to have a total population of 3.2 million.

In the FCT the duration of sunshine range from 6-8 hours per day in the south and 8-10 hours per day in the North from January to April / may. There is however a steep drop to a mean of about 4 hours per day in the month of July / August largely due to increase in cloud cover it starts again in the month of September.

Abuja, a virgin land with virtually no amenities of any sort before 1976 even where the pioneer civil servants would stay became a test case. Therefore Civil Servants had to stay in scattered level hotels in Suleja for residential accommodation and a borrowed Niger State Housing Estate had to be used as the Head Quarters of the FCDA.

The only road from Suleja to the Linther land of the territory was a colonial narrow tarred road.

FCDA is a parastatals under the Ministry for the Federal Capital Territory (MFCT) responsible for the physical development f the territory.

Under FCDA is the Development of Public Building and Engineering. The development of Public Building is in charges of designing and supervising f buildings while the Engineering Development, takes charge of road, dams and Electrical Services and bridges.

Most projects are executed through contractors while little is done by direct labour.

1.2              STATEMENT OF RESEARCH PROBLEMS

It has been observed that inspite f the effort put by government to brings to actualization the conception of its projects, public projects are still massively abandoned at different stages of construction.

What are the factors responsible for the abandonment of public projects?

This study is therefore geared towards examining the factors that cause abandonment of public sector development especially FCDA projects.

1.3              AIMS AND OBJECTIVES

The aims of this project are to examine the causes and effect f abandoned Public Development Projects in the Federal Capital Territory Abuja.

The above aim was drafted with the following objectives in mind.

(i)                 To establish and identify the cause of Abandoned public developmeent project in the Federal Capitals Territory Abuja.

(ii)               To investigate the effect of the abandoned public development projects on the livs of the citizens.

(iii)             To investigate its effects also on the environment.

(iv)             To suggest possible solution to causes of abandonment of public development projects in the Federal Capital Territory Abuja.

1.4       RESEARCH QUESTIONS

(i)                 What are the possible causes of abandonment of Federal Capital Development Authority Project?

(ii)               What are the possible effect of abandonment of such projects?

(iii)             How can abandonment of public development projects be minimized in the Federal Capital Territory Abuja

(iv)             What are the possible solutions to abandonment of public development projects in the Federal Capital Territory Abuja.

1.5       SIGNIFICANCE OF THE STUDY

(i)                 It will assist public sector development to avoid abandonment projects.

(ii)               It will assist researches on similar topics.

(iii)             It will educate the public on abandonment of projects and brief historical background of the FCT.

1.6       OVERVIEW OF THE STUDY

The aim of the project is to examine the causes and effect of abandoned public development project in the Federal Capital Territory Abuja. Some of the causes which include inadequate funding or Bankcrupcy, lack of payment, high interest rate, inflation, improper planning, political reasons, delay in payment, corruption, bureacracy and back of special materials having its effect on lowering of living standard of the populace and as well making the environment look ugly among other effects. The chapter two made a reviews of related and relevant literature.

In the chapter three which is the methodology, both primary and secondary sources of data where used the percentage method. In chapter four the data acquired were presented on tables were analysed accordingly.

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

 

 

Need a Project Writer for a Different Topic

 

Full Project – THE CAUSE OF ABANDONED PUBLIC DEVELOPMENT PROJECTS IN ABUJA

Click here to Get The Complete Research Project Chapter 1-5

RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | Https://eduschooler.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
Simply click on the Download button above and follow the procedure stated.
I have a fresh topic that is not on your website. How do I go about it?
Chat with us on WhatsApp or contact our Instant Help Desk for a custom research project on your topic.
How fast can I get this complete project on any project topic?
Within 15 minutes if you want this exact project topic without adjustment.
Is it a complete research project or just materials?
It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data.
What if I want to change the case study for this topic?
Chat with Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
How will I get my complete project?
Your Complete Project Material will be sent to your Email Address in Ms Word document format.
Can I get my Complete Project through WhatsApp?
Yes! We can send your Complete Research Project to your WhatsApp Number.
What if my Project Supervisor made some changes to a topic I picked from your website?
Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
Do you assist students with Assignment and Project Proposal?
Yes! Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
What if I do not have any project topic idea at all?
Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 708 7083 227.
How can I trust this site?
We are genuine and duly registered with the Corporate Affairs Commission. This site runs on Secure Sockets Layer (SSL), ensuring all transactions are highly secure and safe.
Customer Testimonials | Https://eduschooler.com

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. Https://eduschooler.com delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://eduschooler.com is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend eduschooler.com to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!

Live Chat
Admin is typing...