Full Project – Design and implementation of computerized front management information system (hotel)

Full Project – Design and implementation of computerized front management information system (hotel)

Click here to Get this Complete Project Chapter 1-5

CHAPTER ONE

INTRODUCTION

The hotel front office management information system is the control center for the property and workers at the supervisory level  and above must be well trained and motivated in order to achieve business objectives of high yield, high occupancy rates and above all top quality service.  in hotel front office management hotel general manager are required to meet the challenges of day to day operation while practicing solid future planning and controlling skills.

The technological advantages today’s hotel managers have at their disposal and the challenges of living, training, scheduling and empowering workers to achieve to quality result.

The top quality hotel in Nigeria is owned by government, other smaller hotels owned by individual do not keep to  the standard for hotel operations.  This because the only reason for the setting up of a hotel is to maximize profit.  They do not take into account the welfare and condition of their customer.  This result in many of the customers not being satisfied after their stay in these hotel due to poor management and time wasting in the flow of information with and outside the hotel environment.  Using zodiac hotel lit examing the effect of computerization of hotel front office management information system in our hotels.

Zodiac hotel ltd is one of the well know hotel in Enugu and it is a private limited company.  It is located at 5/7 rangers Avenue, Enugu.

It was established in 1979 by late honorable MR.P.N. Okeke.  The administration of zodiac hotel is as follows:

Executive director, board of directors, managing director, head of department/supervisors and staff.

Make up the firm are Admin. Dept., account dept., reception, cash office, business center telephone exchange, restaurant, bar house keeping laundry, gardeners, reception waiters, store dept, driver section, kitchen dept, car hire section and security dept.

 

1.1      STATEMENT OF PROBLEM

The present system of hotel front office management information system in Nigeria  has a lot of problem which are mentioned below.

 

 

SPEED OF OPERATION:

Speed of operation is a measure of the time lapse from when a process starts to workers to when it end. Since the present system is manually operated, there is tendency for the workers of checking-in a guest, issuing of receipts checking-out a guest can take the receptionist (front officer) hour to finish.

 

ACCURACY

In term of accuracy, the  system is relatively slow and since it is dependent to human effort, so inevitable, it is also prone to human errors and omission. Example the issuing of receipts, most of the time is not accurate.  The bills prepared are sometime over charged or undercharge and this can be very embarrassing to both  guest and the management.  The overcharging or under charging could be due to the receptionist’s carelessness or the inefficiency of the part of the account section.

 

DOCUMENT INTEGRITY

This is viewed in the context of the safety, invalidity of the records in the document files used in the report generation.  In terms of safety, the nature of the system (manual) makes it vulnerable to left, fire or accidental destruction.  This makes the system unsafe as the time needed to replace lost data or files in enormously large

 

COST:

This is the greatest problem of the hotel.  The hotel tends to loose a lot of money running the hotel manually.

 

TIME:

Going by the present system of operation time is consumed in the handling of operation and management of information in the hotel.

These problem and many other not listed above due limitations, form the basis of this write-up

 

1.2      PURPOSE OF STUDY

This study is designed to help the hotel front office to handle the flow and use of information in the hotel operation effectively.  This study also tries to give an in dept looking in the easiest and most effective way for the growth and development of hotel industry in the country.

Finally, the study will help new investors in the hotel industry to make the right   decision and steps needed to start up a hotel.

 

1.3      AIMS AND OBJECTIVE OF THE STUDY

The objectives of the study are as follows:

  1. To provide better service for the various guests either permanent, temporary or causal guest that comes to lodge or stay in the hotel.
  2. To produce a system where information and output report will be produced much faster, more accurately and more detailed to management and guest of hotel.
  3. To keep records that are compact, integrated and updated.

 

1.4             SCOPE OF THE STUDY

This study is armed at finding out how effective the computerization of a hotel front office management information system will improve the operation of the hotel system in small hotels.  However, out of the several departments that makes up the hotel. This research project is restricted to only one section reception (front office) section

1.5             LIMITATION

The following   constraints were faced by the researcher and limited the effort in the developing of a comprehensive package needed in a hotel industry.

  1. TIME: This project work has one semester time limit. It would have been desirable for a longer period of time for the development of a package for the hotel
  2. INFORMATION:             For some security reason, access to some vital information were derived by the management of the zodiac hotel ltd

 

1.6             ASSUMPTION

Due to insufficient information, I assumed the following:

  1. The records of the information, about the guest has not be computerized.
  2. The people that are going to use the software computer literate

 

1.7             DEFINTION OF TERMS

  1. GUEST: This guest are used in the contest of the work refers to individual, companies or corporate bodies who spends some time in the hotel either as permanent, temporary or casual guest
  2. RECEIPTS: This is a place of paper which contains the description of expenditure and amount paid for a service by the guest and also include is the name and address of guest.

 

SYSTEM FILE

  1. ARRIVAL FILE: This is master file consisting of the guest name, companies name and address, state, country, nationality, profession etc.  which also include the mode of payment to be used by the guest.
  2. MENU FILE: This is a transaction file used in the new system.  It consists of the descriptions of food, the price of the good and the menu code
  3. REST FILE:             This is also a transaction file that consist information bill, the about   restaurant bill, the room price reference number, dates etc.

 

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for international clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour

32    Other Projects pdf doc

  1. Political Science
  2. Psychology
  3. Public Administration
  4. Public Health Research Project
  5. More Research Project
  6. Transportation Management
  7. Nursing

Education

Essay 

 

 

Full Project – Design and implementation of computerized front management information system (hotel)

Click here to Get The Complete Research Project Chapter 1-5

RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | Https://eduschooler.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
Simply click on the Download button above and follow the procedure stated.
I have a fresh topic that is not on your website. How do I go about it?
Chat with us on WhatsApp or contact our Instant Help Desk for a custom research project on your topic.
How fast can I get this complete project on any project topic?
Within 15 minutes if you want this exact project topic without adjustment.
Is it a complete research project or just materials?
It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data.
What if I want to change the case study for this topic?
Chat with Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
How will I get my complete project?
Your Complete Project Material will be sent to your Email Address in Ms Word document format.
Can I get my Complete Project through WhatsApp?
Yes! We can send your Complete Research Project to your WhatsApp Number.
What if my Project Supervisor made some changes to a topic I picked from your website?
Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
Do you assist students with Assignment and Project Proposal?
Yes! Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
What if I do not have any project topic idea at all?
Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 708 7083 227.
How can I trust this site?
We are genuine and duly registered with the Corporate Affairs Commission. This site runs on Secure Sockets Layer (SSL), ensuring all transactions are highly secure and safe.
Customer Testimonials | Https://eduschooler.com

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. Https://eduschooler.com delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://eduschooler.com is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend eduschooler.com to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!